Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0574 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,135 | $501 | n/a |
AS0574 # 05 Y:2024 | 05 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $649 | $152 | n/a |
AS0574 # 06 Y:2024 | 06 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $264 | $267 | n/a |
AS0574 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,317 | $2,384 | n/a |
AS0574 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,540 | $1,389 | n/a |
AS0574 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,273 | $271,736 | n/a |
AM0907 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,120 | $358,027 | n/a |
AM0907 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,950 | $5,135 | n/a |
AM0907 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $625 | $240 | n/a |
AM0907 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $8,350 | n/a |
AM0907 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $39,560 | $5,000 | n/a |
WM0211 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,617 | $9,500 | n/a |
WM0211 # 02 Y:2024 | 02 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $5,517 | $16,193 | n/a |
WM0211 # 01 Y:2024 | 01 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $7,114 | $700 | n/a |
WM0211 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,148 | $150 | n/a |
WM0211 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $345 | n/a |
WM0211 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $0 | n/a |
LE0557 # 08 Y:2024 | 08 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,250 | $37,000 | n/a |
LE0557 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,463 | $29,000 | n/a |
LE0557 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $291,977 | $600,000 | n/a |
LE0557 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197,906 | $323,780 | n/a |
LE0557 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,783 | $9,500 | n/a |
LE0557 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,494 | $100 | n/a |
LE0557 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $87,150 | $3,000 | n/a |
LE0557 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $279,544 | $0 | n/a |