IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

247

matching recommendations
Reset
NAICS 334412 Bare Printed Circuit Board Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0826 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $323 $625 Not Implemented
MA0826 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,639 $14,650 Not Implemented
MA0826 # 01 Y:2021 01 2021 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $27,883 $250,000 Not Implemented
MA0826 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $979 $1,631 Implemented
MA0826 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $551 $1,450 Implemented
MA0826 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $552 $250 Not Implemented
MA0826 # 03 Y:2021 03 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,447 $10,800 Not Implemented
UD1011 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $2,908 $45,000 Implemented
UD1011 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,486 $9,000 Implemented
UD1011 # 03 Y:2020 03 2020 USE OPTIMUM TEMPERATURE $881 $0 Not Implemented
UD1011 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $49 $0 Implemented
UD1011 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $609 $1,000 Not Implemented
UD1011 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,143 $3,000 Not Implemented
SU0433 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,804 $18,859 Implemented
SU0433 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $22,841 $23,500 Not Implemented
SU0433 # 06 Y:2017 06 2017 INSULATE FEEDWATER TANK $21 $26 Not Implemented
SU0433 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $565 Not Implemented
SU0433 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,678 $1,464 Implemented
SU0433 # 01 Y:2017 01 2017 ELIMINATE/REDUCE AN OPERATION $16,596 $1,821 Implemented
SU0433 # 10 Y:2017 10 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $84 $294 Not Implemented
SU0433 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $12,137 $1,162 Implemented
SU0433 # 09 Y:2017 09 2017 ELIMINATE/REDUCE AN OPERATION $23,968 $66,186 Not Implemented
SU0433 # 05 Y:2017 05 2017 REDUCE VENTILATION AIR $464 $489 Not Implemented
SU0433 # 11 Y:2017 11 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $268 $977 Not Implemented
MI0298 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $8,588 Not Implemented