Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 334413 | Semiconductor and Related Device Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0538 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,438 | $3,603 | Not Implemented |
AS0538 # 05 Y:2022 | 05 | 2022 | USE PHOTOCELL CONTROLS | $3,648 | $8,619 | Not Implemented |
AS0538 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $99,703 | $442,407 | Not Implemented |
AS0538 # 03 Y:2022 | 03 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $170,279 | $17,076 | Not Implemented |
AS0538 # 02 Y:2022 | 02 | 2022 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $290,625 | $126,000 | Not Implemented |
AS0538 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $722,230 | $2,223,000 | Not Implemented |
AS0433 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
AS0433 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,142 | $7,500 | n/a |
AS0433 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0433 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,471 | $30,000 | n/a |
AS0432 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
AS0432 # 03 Y:2006 | 03 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $9,888 | $3,000 | n/a |
AS0432 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0432 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $17,236 | $15,000 | n/a |
AS0408 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,267 | $3,000 | Not Implemented |
AS0408 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,575 | $14,371 | Not Implemented |
AS0408 # 04 Y:2005 | 04 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,761 | $24,575 | Not Implemented |
AS0408 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,472 | $1,000 | Not Implemented |
AS0408 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,937 | $38,229 | Not Implemented |
AS0408 # 01 Y:2005 | 01 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $505,076 | $214,240 | Not Implemented |
AS0347 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,462 | $0 | Implemented |
AS0347 # 09 Y:2003 | 09 | 2003 | CLEAR AND RENT EXISTING SPACE | $15,165 | $11,220 | n/a |
AS0347 # 08 Y:2003 | 08 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $64,137 | $800 | Not Implemented |
AS0347 # 07 Y:2003 | 07 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $27,104 | $6,400 | Not Implemented |
AS0347 # 06 Y:2003 | 06 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $720 | $40 | Implemented |