IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
NAICS 334417 Electronic Connector Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0225 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,037 $53,169 Not Implemented
TT0225 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,576 $3,500 Not Implemented
TT0225 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $3,390 Not Implemented
TT0225 # 05 Y:2019 05 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,118 $1,900 Not Implemented
LE0475 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,356 $15,000 Not Implemented
LE0475 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,240 $0 Implemented
LE0475 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,177 $2,000 Not Implemented
LE0475 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,128 $10,000 Not Implemented
LE0475 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $12,830 Implemented
LE0475 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $50 $200 Implemented
LE0475 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,265 $46,000 Not Implemented
LE0475 # 07 Y:2019 07 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,604 $56,575 Not Implemented
AS0465 # 06 Y:2019 06 2019 RECOVER MECHANICAL ENERGY $4,582 $20,880 Not Implemented
AS0465 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,608 $3,900 Not Implemented
AS0465 # 04 Y:2019 04 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,850 $17,634 Implemented
AS0465 # 03 Y:2019 03 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $41,936 $1,100 Not Implemented
AS0465 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $56,756 $18,258 Not Implemented
AS0465 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,350 $43,576 Not Implemented
SU0460 # 02 Y:2018 02 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,582 $126 Not Implemented
SU0460 # 01 Y:2018 01 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,991 $352 Not Implemented
SU0460 # 03 Y:2018 03 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $862 $99 Not Implemented
SU0460 # 04 Y:2018 04 2018 ELIMINATE/REDUCE AN OPERATION $8,653 $3,004 Not Implemented
SU0460 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $1,766 Not Implemented
SU0460 # 08 Y:2018 08 2018 OPTIMIZE PLANT POWER FACTOR $5,002 $8,529 Not Implemented
SU0460 # 05 Y:2018 05 2018 REDUCE VENTILATION AIR $5,101 $1,528 Not Implemented