Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
332
matching recommendationsNAICS | 334419 | Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0605 # 01 Y:2025 | 01 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,690 | $25,500 | n/a |
AS0605 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,580 | $17,986 | n/a |
AS0605 # 03 Y:2025 | 03 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,531 | $210 | n/a |
AS0605 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $929 | $2,002 | n/a |
AS0605 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $583 | $2,577 | n/a |
AS0605 # 06 Y:2025 | 06 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $431 | $818 | n/a |
AS0605 # 07 Y:2025 | 07 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $64 | $260 | n/a |
SJ0033 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $0 | n/a |
SJ0033 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,035 | $0 | n/a |
SJ0033 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,132 | $39,246 | n/a |
SJ0033 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,071 | $384 | n/a |
SJ0033 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $39,875 | $0 | n/a |
SJ0033 # 08 Y:2025 | 08 | 2025 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $57,302 | $150,000 | n/a |
SJ0033 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,984 | $316 | n/a |
SJ0033 # 09 Y:2025 | 09 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,191 | $0 | n/a |
SJ0033 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $123,902 | $507,150 | n/a |
SJ0033 # 10 Y:2025 | 10 | 2025 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $88,611 | $0 | n/a |
UU0262 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $762 | $2,640 | n/a |
UU0262 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $12,361 | $217,800 | n/a |
UU0262 # 04 Y:2025 | 04 | 2025 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $13,561 | $178,488 | n/a |
UU0262 # 06 Y:2025 | 06 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $720 | $1,680 | n/a |
UU0262 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $14,276 | $180,000 | n/a |
UU0262 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,117 | $834 | n/a |
UU0262 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $24,314 | $29,878 | n/a |
UU0262 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,129 | $12,300 | n/a |