IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

332

matching recommendations
Reset
NAICS 334419 Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0124 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,534 $0 Implemented
WM0124 # 02 Y:2018 02 2018 PAY UTILITY BILLS ON TIME $2,620 $0 Not Implemented
NC0599 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36,992 Implemented
NC0599 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $300 $1,500 Implemented
NC0599 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,262 $500 Not Implemented
NC0599 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,240 $200 Implemented
NC0599 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,472 $2,940 Not Implemented
NC0599 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $4,037 $13,627 Implemented
OK0963 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,783 $62,981 Not Implemented
OK0963 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,310 $5,608 Not Implemented
OK0963 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,937 $38,220 Implemented
OK0963 # 04 Y:2017 04 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,699 $12,090 Not Implemented
OK0963 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $0 Implemented
OK0963 # 06 Y:2017 06 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,116 $1,182 Implemented
MZ0204 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,536 $1,500 Implemented
MZ0204 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,259 $37,722 Implemented
MZ0204 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,678 $1,200 Implemented
MZ0204 # 04 Y:2016 04 2016 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $266 $0 Not Implemented
MZ0204 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,246 $1,212 Implemented
TT0165 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,510 $75,000 Not Implemented
TT0165 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,405 $88,306 Implemented
TT0165 # 03 Y:2016 03 2016 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,033 $3,600 Implemented
TT0165 # 04 Y:2016 04 2016 OPERATE BOILERS ON HIGH FIRE SETTING $4,000 $12,000 Implemented
TT0165 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,310 $1,919 Implemented
TT0165 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $1,500 Implemented