IAC logo
IAC Assessment: NC0599
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0599
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Electronic switches
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 58
Plant Area (Sq.Ft.) 55,000
Annual Production 300,000 Units
Production Hrs. Annual 2,100
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,303 1,563,040 kWh $0.05
Electricity Demand $38,716 4,307 kW-months/year $8.99
Natural Gas $3,514 468 MMBtu $7.51
TOTAL ENERGY COSTS $123,533
RECOMMENDED SAVINGS* $23,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,833
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,256
Cost:
$36,992
$6,506 125,122 $5,212 580 - - - - $1,538 - $6,506
125,122
kWh
$5,212
580
kW-months/year
-
-
MMBtu
-
-
$
$1,538
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$300
Cost:
$1,500
$300 5,775 - - - - - - - - $300
5,775
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,262
Cost:
$500
- - - - $1,262 168 - - - - -
-
kWh
-
-
kW-months/year
$1,262
168
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,240
Cost:
$200
$1,957 37,632 $483 54 - - $(-100) - $(-100) - $1,957
37,632
kWh
$483
54
kW-months/year
-
-
MMBtu
$(-100)
-
$
$(-100)
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,472
Cost:
$2,940
$2,472 47,530 - - - - - - - - $2,472
47,530
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,037
Cost:
$13,627
$2,255 43,361 $1,782 198 - - - - - - $2,255
43,361
kWh
$1,782
198
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,567
Cost:
$55,759
$13,490 259,420 $7,477 832 $1,262 168 $(-100) - $1,438 - $13,490
259,420
kWh
$7,477
832
kW-months/year
$1,262
168
MMBtu
$(-100)
-
$
$1,438
-
$
TOTAL IMPLEMENTED Savings:
$19,833
Cost:
$52,319
$11,018 211,890 $7,477 832 - - $(-100) - $1,438 - $11,018
211,890
kWh
$7,477
832
kW-months/year
-
-
MMBtu
$(-100)
-
$
$1,438
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost