IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 334419 Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0434 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,559 $12,210 Not Implemented
MI0434 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $14,048 $0 Implemented
MI0434 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,225 $2,000 Implemented
MI0434 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,323 $7,394 Implemented
MI0434 # 06 Y:2023 06 2023 REPLACE TREATED WATER WITH WELL / SURFACE WATER $3,200 $3,460 Not Implemented
MI0434 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $2,333 $750 Not Implemented
MI0434 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,530 $960 Implemented
MI0434 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,836 $550 Implemented
SU0542 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $250 Implemented
SU0542 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,088 $0 Not Implemented
SU0542 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,596 $390 Not Implemented
SU0542 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $651 $85 Implemented
SU0542 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $1,750 Implemented
SU0542 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,343 $4,218 Implemented
SU0542 # 07 Y:2023 07 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,035 $1,460 Not Implemented
MU0036 # 12 Y:2023 12 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,544 $17,271 Not Implemented
MU0036 # 13 Y:2023 13 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $5,347 $25,171 Not Implemented
MU0036 # 11 Y:2023 11 2023 USE RADIANT HEATER FOR SPOT HEATING $4,730 $5,760 Not Implemented
MU0036 # 09 Y:2023 09 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $3,433 $3,037 Not Implemented
MU0036 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,852 $0 Not Implemented
MU0036 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $388 $0 Implemented
MU0036 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,129 $49,885 Implemented
MU0036 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,737 $0 Implemented
MU0036 # 05 Y:2023 05 2023 USE PHOTOCELL CONTROLS $756 $0 Implemented
MU0036 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,296 $30 Not Implemented