Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 334419 | Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0605 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,580 | $17,986 | n/a |
AS0605 # 03 Y:2025 | 03 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,531 | $210 | n/a |
AS0605 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $929 | $2,002 | n/a |
AS0605 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $583 | $2,577 | n/a |
AS0605 # 06 Y:2025 | 06 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $431 | $818 | n/a |
AS0605 # 07 Y:2025 | 07 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $64 | $260 | n/a |
AS0605 # 01 Y:2025 | 01 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,690 | $25,500 | n/a |
SJ0033 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,984 | $316 | n/a |
SJ0033 # 10 Y:2025 | 10 | 2025 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $88,611 | $0 | n/a |
SJ0033 # 09 Y:2025 | 09 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,191 | $0 | n/a |
SJ0033 # 08 Y:2025 | 08 | 2025 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $57,302 | $150,000 | n/a |
SJ0033 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $39,875 | $0 | n/a |
SJ0033 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,035 | $0 | n/a |
SJ0033 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $0 | n/a |
SJ0033 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $123,902 | $507,150 | n/a |
SJ0033 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,071 | $384 | n/a |
SJ0033 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,132 | $39,246 | n/a |
UU0262 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $12,361 | $217,800 | n/a |
UU0262 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $14,276 | $180,000 | n/a |
UU0262 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $24,314 | $29,878 | n/a |
UU0262 # 04 Y:2025 | 04 | 2025 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $13,561 | $178,488 | n/a |
UU0262 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $762 | $2,640 | n/a |
UU0262 # 06 Y:2025 | 06 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $720 | $1,680 | n/a |
UU0262 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,117 | $834 | n/a |
UU0262 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,129 | $12,300 | n/a |