IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

944

matching recommendations
Reset
NAICS 3345 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0078 # 04 Y:2015 04 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,083 $3,000 Not Implemented
WM0078 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,459 $11,985 Not Implemented
WM0078 # 06 Y:2015 06 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,749 $8,000 Not Implemented
WM0078 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,708 $400 Not Implemented
WM0078 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,724 $2,584 Not Implemented
WM0078 # 09 Y:2015 09 2015 USE PHOTOCELL CONTROLS $2,082 $2,816 Not Implemented
WM0078 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,824 $1,300 Not Implemented
WM0078 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,156 $300 Not Implemented
WM0078 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $1,006 $1,500 Not Implemented
OR0650 # 01 Y:2015 01 2015 ELIMINATE/REDUCE AN OPERATION $20,348 $2,295 Not Implemented
OR0650 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $23,922 $24,660 Not Implemented
OR0650 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $719 $1,200 Implemented
OR0650 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,001 $2,678 Not Implemented
OR0650 # 05 Y:2015 05 2015 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $1,291 $4,404 Implemented
OR0650 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $16,731 $135,510 Not Implemented
MZ0170 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $56,753 $214,172 Not Implemented
MZ0170 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,189 $17,018 Not Implemented
MZ0170 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,117 $0 Not Implemented
MZ0170 # 04 Y:2015 04 2015 CONDENSE OPERATION INTO ONE BUILDING $11,328 $0 Not Implemented
LE0384 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,262 $250 Not Implemented
LE0384 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,272 $1,481 Implemented
LE0384 # 03 Y:2014 03 2014 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,284 $1,010 Not Implemented
LE0384 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,878 $2,080 Not Implemented
LE0384 # 05 Y:2014 05 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $46,884 $80,000 Not Implemented
LE0384 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,875 $3,304 Implemented