IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

944

matching recommendations
Reset
NAICS 3345 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0441 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $651 $420 Implemented
SF0441 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $5,725 $23,868 Not Implemented
SF0441 # 04 Y:2013 04 2013 COMBINE UTILITY METERS $1,679 $3,085 Not Implemented
SF0441 # 05 Y:2013 05 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $46,828 $377,867 Not Implemented
SU0350 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,408 $0 Implemented
SU0350 # 02 Y:2013 02 2013 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,049 $0 Implemented
SU0350 # 03 Y:2013 03 2013 PAY BILLS ON TIME TO AVOID LATE FEES $1,239 $0 Implemented
SU0350 # 04 Y:2013 04 2013 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $30,158 $131 Implemented
SU0350 # 05 Y:2013 05 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $191 Implemented
SU0350 # 06 Y:2013 06 2013 INSULATE FEEDWATER TANK $579 $190 Implemented
SU0350 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $579 $340 Implemented
SU0350 # 08 Y:2013 08 2013 ELIMINATE/REDUCE AN OPERATION $18,624 $29,949 Not Implemented
SU0350 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $771 Implemented
SU0350 # 10 Y:2013 10 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $298 $705 Not Implemented
SU0350 # 11 Y:2013 11 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $221 $616 Implemented
SU0350 # 12 Y:2013 12 2013 UPGRADE OBSOLETE EQUIPMENT $189 $852 Implemented
LE0367 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,354 $9,800 Not Implemented
LE0367 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,213 $15,750 Implemented
LE0367 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,711 $0 Implemented
LE0367 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,606 $15,100 Not Implemented
LE0367 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,516 $1,350 Implemented
LE0367 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,165 $16,000 Not Implemented
LE0367 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,515 $500 Not Implemented
LE0367 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,499 $990 Not Implemented
AM0637 # 01 Y:2013 01 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,820 $400 Not Implemented