IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

944

matching recommendations
Reset
NAICS 3345 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0667 # 09 Y:2011 09 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,515 $4,000 Not Implemented
MA0667 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,129 $6,340 Not Implemented
MA0667 # 07 Y:2011 07 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,047 $17,500 Not Implemented
MA0667 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,246 $3,000 Not Implemented
MA0667 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,023 $250 Implemented
MA0667 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $8,118 $0 Implemented
MA0667 # 03 Y:2011 03 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $11,694 $10,590 Implemented
MA0667 # 02 Y:2011 02 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $31,118 $100,000 Not Implemented
SU0296 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $81,934 $0 Implemented
SU0296 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,948 $0 Not Implemented
SU0296 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,753 $554 Not Implemented
SU0296 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $758 $447 Implemented
SU0296 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $793 Not Implemented
SU0296 # 06 Y:2010 06 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $79,942 $129,646 Implemented
SU0296 # 07 Y:2010 07 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $71,218 $132,133 Not Implemented
SU0296 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $373 $732 Not Implemented
SU0296 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $5,928 Not Implemented
SU0296 # 10 Y:2010 10 2010 OPTIMIZE PLANT POWER FACTOR $1,823 $8,254 Not Implemented
MI0186 # 01 Y:2009 01 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $160,282 $0 Implemented
MI0186 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $110,625 $4,000 Implemented
MI0186 # 03 Y:2009 03 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $76,266 $28,000 Not Implemented
MI0186 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $56,948 $10,000 Implemented
MI0186 # 05 Y:2009 05 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $24,293 $1,600 Not Implemented
MI0186 # 06 Y:2009 06 2009 DISCONNECT BALLASTS $3,090 $900 Not Implemented
UF0427 # 01 Y:2009 01 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $587 $0 Implemented