Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
944
matching recommendationsNAICS | 3345 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0334 # 02 Y:2006 | 02 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,870 | $1,000 | Implemented |
NC0334 # 03 Y:2006 | 03 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,466 | $500 | Implemented |
NC0334 # 04 Y:2006 | 04 | 2006 | RECOVER AND REUSE COOLING WATER | $1,680 | $620 | Implemented |
NC0334 # 05 Y:2006 | 05 | 2006 | REDUCE VENTILATION AIR | $10,892 | $4,000 | Implemented |
NC0334 # 06 Y:2006 | 06 | 2006 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,773 | $1,300 | Implemented |
NC0334 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,065 | $0 | Implemented |
NC0334 # 08 Y:2006 | 08 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,306 | $8,000 | Implemented |
NC0334 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $5,061 | $3,300 | Implemented |
NC0334 # 10 Y:2006 | 10 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,095 | $100 | Implemented |
NC0334 # 11 Y:2006 | 11 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,138 | $9,824 | Not Implemented |
NC0334 # 12 Y:2006 | 12 | 2006 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $5,012 | $4,200 | Not Implemented |
AM0503 # 01 Y:2006 | 01 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $16,230 | $33,000 | Not Implemented |
AM0503 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,600 | $500 | Implemented |
AM0503 # 03 Y:2006 | 03 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,550 | $17,100 | Not Implemented |
AM0503 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,320 | $300 | Implemented |
AM0503 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $930 | $27 | Implemented |
AM0503 # 06 Y:2006 | 06 | 2006 | REUSE RAGS UNTIL COMPLETELY SOILED | $880 | $0 | Not Implemented |
AM0503 # 07 Y:2006 | 07 | 2006 | USE SYNTHETIC LUBRICANT | $256 | $0 | Not Implemented |
WI0503 # 03 Y:2005 | 03 | 2005 | USE OPTIMUM THICKNESS INSULATION | $8,005 | $7,500 | Not Implemented |
WI0503 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,209 | $21,960 | Not Implemented |
WI0503 # 01 Y:2005 | 01 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $47,772 | $9,625 | Not Implemented |
WI0503 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,112 | $1,000 | Not Implemented |
WI0503 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,506 | $0 | Not Implemented |
WI0503 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,350 | $640 | Not Implemented |
WI0503 # 07 Y:2005 | 07 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,742 | $4,900 | Not Implemented |