IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

944

matching recommendations
Reset
NAICS 3345 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0593 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,604 $0 Implemented
UF0593 # 08 Y:2023 08 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $121,588 $12,000 Implemented
UF0593 # 09 Y:2023 09 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $36,476 $11,225 Implemented
CI0011 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $11,157 $4,800 Not Implemented
CI0011 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,809 $20,000 Not Implemented
CI0011 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,448 $2,393 Not Implemented
CI0011 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,298 $0 Not Implemented
CI0011 # 05 Y:2023 05 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,181 $6,150 Not Implemented
CI0011 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,753 $500 Not Implemented
MI0421 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281,585 $342,472 Not Implemented
MI0421 # 02 Y:2023 02 2023 AIR CONDITION ONLY SPACE NECESSARY $92,381 $7,860 Not Implemented
MI0421 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $61,330 $1,580 Not Implemented
MI0421 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $51,887 $23,900 Not Implemented
MI0421 # 05 Y:2023 05 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $49,124 $120 Implemented
MI0421 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $47,137 $1,580 Not Implemented
MI0421 # 07 Y:2023 07 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,466 $1,492 Implemented
MI0421 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,009 $0 Implemented
MI0421 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $2,695 $1,365 Implemented
MI0421 # 10 Y:2023 10 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $670 $1,980 Implemented
MA0854 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,825 $12,405 Implemented
MA0854 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $4,889 $35,240 Not Implemented
MA0854 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,725 $7,950 Not Implemented
MA0854 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $3,953 $6,018 Implemented
MA0854 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,126 $1,425 Not Implemented
MA0854 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,399 $3,125 Implemented