Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 3345 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0745 # 06 Y:2003 | 06 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,513 | $350 | Not Implemented |
GT0745 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,711 | $0 | Implemented |
GT0745 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,387 | $5,000 | Implemented |
GT0745 # 02 Y:2003 | 02 | 2003 | COMBINE UTILITY METERS | $996 | $0 | Not Implemented |
GT0745 # 01 Y:2003 | 01 | 2003 | INSULATE BARE EQUIPMENT | $1,646 | $264 | Not Implemented |
GT0745 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,124 | $12,499 | Implemented |
GT0745 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,644 | $10,000 | Not Implemented |
GT0745 # 08 Y:2003 | 08 | 2003 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $22,273 | $8,000 | Not Implemented |
GT0745 # 09 Y:2003 | 09 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $43,576 | $51,000 | n/a |
AS0359 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,100 | $750 | Not Implemented |
AS0359 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $127 | $200 | Not Implemented |
AS0359 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,910 | $9,710 | Not Implemented |
AS0359 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $558 | $850 | Not Implemented |
AS0359 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $73,763 | $118,320 | Not Implemented |
OK0665 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,094 | $6,844 | Not Implemented |
OK0665 # 01 Y:2003 | 01 | 2003 | INSTALL SET-BACK TIMERS | $4,895 | $664 | Implemented |
OK0665 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,602 | $0 | Not Implemented |
OK0665 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $1,398 | $1,374 | Not Implemented |
OK0665 # 09 Y:2003 | 09 | 2003 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,136 | $32,000 | n/a |
OK0665 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $1,048 | Implemented |
OK0665 # 04 Y:2003 | 04 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,748 | $3,480 | Implemented |
OK0665 # 05 Y:2003 | 05 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $10,600 | $0 | Implemented |
OK0665 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,550 | $13,880 | Implemented |
AS0354 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $117 | $60 | Implemented |
AS0354 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $756 | $825 | Not Implemented |