IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0637 # 03 Y:2013 03 2013 INSTALL SKYLIGHTS $4,110 $6,350 Not Implemented
AM0637 # 04 Y:2013 04 2013 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,790 $4,250 Not Implemented
AM0637 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,500 $260 Not Implemented
AM0637 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $15 Not Implemented
AM0637 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $315 $350 Not Implemented
AM0637 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $260 $0 Not Implemented
AM0503 # 01 Y:2006 01 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $16,230 $33,000 Not Implemented
AM0503 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $500 Implemented
AM0503 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $6,550 $17,100 Not Implemented
AM0503 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $300 Implemented
AM0503 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $27 Implemented
AM0503 # 06 Y:2006 06 2006 REUSE RAGS UNTIL COMPLETELY SOILED $880 $0 Not Implemented
AM0503 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $256 $0 Not Implemented
AM0430 # 01 Y:2003 01 2003 USE WATER-BASED ADHESIVES $51,560 $10,000 Not Implemented
AM0430 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $180 $0 Implemented
AM0430 # 02 Y:2003 02 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,620 $340 Not Implemented
AM0430 # 03 Y:2003 03 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,770 $9,000 Not Implemented
AM0430 # 04 Y:2003 04 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,840 $700 Implemented
AM0430 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $0 Implemented
AM0430 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $850 $77 Implemented
AM0430 # 07 Y:2003 07 2003 REUSE RAGS UNTIL COMPLETELY SOILED $795 $0 Implemented
AM0430 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $280 $90 Not Implemented
AM0430 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $630 Not Implemented