Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 33451 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0644 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $738 | $3,205 | Not Implemented |
SD0644 # 04 Y:2024 | 04 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $3,868 | $8,200 | Not Implemented |
SD0644 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $189 | $240 | Not Implemented |
SD0644 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $595 | $1,016 | Not Implemented |
SD0644 # 01 Y:2024 | 01 | 2024 | USE PHOTOCELL CONTROLS | $693 | $1,890 | Not Implemented |
SD0644 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $5,961 | $1,050 | Not Implemented |
SD0644 # 06 Y:2024 | 06 | 2024 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $61,738 | $0 | Not Implemented |
SD0644 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,342 | $141,268 | Not Implemented |
SD0644 # 08 Y:2024 | 08 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $7,472 | $0 | Not Implemented |
CI0011 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,298 | $0 | Not Implemented |
CI0011 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,448 | $2,393 | Not Implemented |
CI0011 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,753 | $500 | Not Implemented |
CI0011 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $11,157 | $4,800 | Not Implemented |
CI0011 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,809 | $20,000 | Not Implemented |
CI0011 # 05 Y:2023 | 05 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,181 | $6,150 | Not Implemented |
SD0619 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,059 | $4,547 | Implemented |
SD0619 # 02 Y:2021 | 02 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,715 | $4,000 | Not Implemented |
SD0619 # 03 Y:2021 | 03 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,606 | $387,000 | Not Implemented |
SD0554 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,214 | $2,470 | Not Implemented |
SD0554 # 01 Y:2017 | 01 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $30,343 | $65,600 | Implemented |
SD0554 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $271 | $200 | Implemented |
SD0554 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $274 | $1,300 | Implemented |
SD0554 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,849 | $4,785 | Not Implemented |
SD0554 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $356 | $1,450 | Implemented |
SD0554 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,421 | $15,275 | Implemented |