IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0620 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $2,156 $350 n/a
UF0620 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,038 $0 n/a
UF0620 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,109 $2,611 n/a
UF0620 # 09 Y:2024 09 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,209 $0 n/a
UF0620 # 11 Y:2024 11 2024 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $40,000 $100,000 n/a
UF0620 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,958 $2,120 n/a
UF0620 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $98,702 $322,644 n/a
UF0620 # 03 Y:2024 03 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,070 $5,250 n/a
UF0620 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,645 $10,635 n/a
UF0620 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,834 $25,400 n/a
UF0620 # 02 Y:2024 02 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,556 $11,198 n/a
UF0593 # 01 Y:2023 01 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $131,807 $215,600 Implemented
UF0593 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $97,641 $400,000 Implemented
UF0593 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $110,377 $92,132 Implemented
UF0593 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,604 $0 Implemented
UF0593 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,641 $136,253 Implemented
UF0593 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $25,827 $58,363 Not Implemented
UF0593 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $62,208 $25,500 Implemented
UF0593 # 09 Y:2023 09 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $36,476 $11,225 Implemented
UF0593 # 08 Y:2023 08 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $121,588 $12,000 Implemented
MI0421 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281,585 $342,472 Not Implemented
MI0421 # 07 Y:2023 07 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,466 $1,492 Implemented
MI0421 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $47,137 $1,580 Not Implemented
MI0421 # 05 Y:2023 05 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $49,124 $120 Implemented
MI0421 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $51,887 $23,900 Not Implemented