IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0745 # 09 Y:2003 09 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $43,576 $51,000 n/a
GT0745 # 08 Y:2003 08 2003 LOWER CEILING TO REDUCE CONDITIONED SPACE $22,273 $8,000 Not Implemented
GT0745 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,644 $10,000 Not Implemented
GT0745 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,513 $350 Not Implemented
GT0745 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,124 $12,499 Implemented
GT0745 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,711 $0 Implemented
GT0745 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,387 $5,000 Implemented
GT0745 # 02 Y:2003 02 2003 COMBINE UTILITY METERS $996 $0 Not Implemented
GT0745 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $1,646 $264 Not Implemented
AS0359 # 05 Y:2003 05 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,910 $9,710 Not Implemented
AS0359 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $73,763 $118,320 Not Implemented
AS0359 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $127 $200 Not Implemented
AS0359 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $14,100 $750 Not Implemented
AS0359 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $558 $850 Not Implemented
OK0665 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,094 $6,844 Not Implemented
OK0665 # 04 Y:2003 04 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,748 $3,480 Implemented
OK0665 # 05 Y:2003 05 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $10,600 $0 Implemented
OK0665 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,398 $1,374 Not Implemented
OK0665 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,550 $13,880 Implemented
OK0665 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,602 $0 Not Implemented
OK0665 # 01 Y:2003 01 2003 INSTALL SET-BACK TIMERS $4,895 $664 Implemented
OK0665 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $1,048 Implemented
OK0665 # 09 Y:2003 09 2003 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,136 $32,000 n/a
AS0354 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $117 $60 Implemented
AS0354 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,918 $4,500 Implemented