Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 33451 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0680 # 02 Y:2011 | 02 | 2011 | REDUCE VENTILATION AIR | $3,229 | $2,895 | Implemented |
MA0680 # 03 Y:2011 | 03 | 2011 | REDUCE VENTILATION AIR | $630 | $2,895 | Implemented |
MA0680 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $265 | $2,000 | Not Implemented |
MA0680 # 05 Y:2011 | 05 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $151 | $0 | Implemented |
MA0680 # 01 Y:2011 | 01 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,371 | $45,123 | Implemented |
SD0439 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,054 | $100 | Not Implemented |
SD0439 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $163,156 | $302,600 | Not Implemented |
SD0439 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,678 | $700 | Not Implemented |
SD0439 # 05 Y:2011 | 05 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $110,990 | $185,200 | Not Implemented |
SD0439 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,510 | $5,375 | Not Implemented |
SD0439 # 04 Y:2011 | 04 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,851 | $8,326 | Not Implemented |
UD0840 # 05 Y:2011 | 05 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $456 | $998 | Not Implemented |
UD0840 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $607 | $300 | Not Implemented |
UD0840 # 03 Y:2011 | 03 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,056 | $0 | Not Implemented |
UD0840 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,128 | $900 | Not Implemented |
UD0840 # 01 Y:2011 | 01 | 2011 | INSTALL OCCUPANCY SENSORS | $1,586 | $1,463 | Not Implemented |
UD0840 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $276 | $25 | Not Implemented |
SD0438 # 06 Y:2011 | 06 | 2011 | INSTALL SKYLIGHTS | $8,562 | $25,530 | Not Implemented |
SD0438 # 05 Y:2011 | 05 | 2011 | OPTIMIZE PLANT POWER FACTOR | $12,712 | $37,600 | Implemented |
SD0438 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,004 | $300 | Implemented |
SD0438 # 02 Y:2011 | 02 | 2011 | COVER OPEN TANKS | $36,210 | $16,850 | Not Implemented |
SD0438 # 03 Y:2011 | 03 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,445 | $1,530 | Not Implemented |
SD0438 # 04 Y:2011 | 04 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $28,654 | $53,450 | Not Implemented |
UA0063 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,438 | $23,295 | Implemented |
UA0063 # 08 Y:2011 | 08 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $35,465 | $27,200 | Implemented |