Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 33451 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0119 # 07 Y:2021 | 07 | 2021 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,837 | $1,000 | Implemented |
CW0119 # 06 Y:2021 | 06 | 2021 | IMPROVE LUBRICATION PRACTICES | $21,048 | $10,400 | Not Implemented |
CW0119 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,381 | $6,000 | Implemented |
CW0119 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,741 | $613 | Not Implemented |
CW0119 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,554 | $0 | Not Implemented |
CW0119 # 02 Y:2021 | 02 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,402 | $1,640 | Implemented |
CW0119 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,804 | $0 | Implemented |
UA0246 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,692 | $373 | Not Implemented |
UA0246 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $855 | $1,067 | Implemented |
UA0246 # 02 Y:2021 | 02 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,152 | $150 | Not Implemented |
UA0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,600 | $9,695 | Implemented |
SD0619 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,059 | $4,547 | Implemented |
SD0619 # 02 Y:2021 | 02 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,715 | $4,000 | Not Implemented |
SD0619 # 03 Y:2021 | 03 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,606 | $387,000 | Not Implemented |
WV0604 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $733 | $35 | Implemented |
WV0604 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,454 | $75,747 | Not Implemented |
WV0604 # 09 Y:2021 | 09 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,302 | $4,100 | Implemented |
WV0604 # 08 Y:2021 | 08 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $1,727 | $6,630 | Not Implemented |
WV0604 # 07 Y:2021 | 07 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $1,749 | $672 | Implemented |
WV0604 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,500 | $1,792 | Implemented |
WV0604 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,431 | $403 | Implemented |
WV0604 # 04 Y:2021 | 04 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,330 | $1,500 | Implemented |
WV0604 # 03 Y:2021 | 03 | 2021 | INSULATE BARE EQUIPMENT | $18,040 | $7,122 | Implemented |
WV0604 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $20,602 | $23,284 | Implemented |