IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1044 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,125 $2,940 Not Implemented
UD1044 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $1,611 $900 Not Implemented
UD1044 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,822 $0 Not Implemented
UD1044 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $704 $0 Not Implemented
UD1044 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $6,187 $750 Not Implemented
UD1044 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $318 $0 Implemented
DL0206 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,447 $8,852 Implemented
DL0206 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,028 $27,352 Implemented
DL0206 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,292 $0 Implemented
DL0206 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,866 $0 Not Implemented
DL0206 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $917 $0 Implemented
OK1066 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $399 $510 Not Implemented
OK1066 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,177 $23,400 Implemented
OK1066 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,182 $0 Not Implemented
OK1066 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $3,854 $7,908 Not Implemented
OK1066 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,555 $0 Implemented
OK1066 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,995 $191,438 Not Implemented
AS0513 # 08 Y:2022 08 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,143 $411 Not Implemented
AS0513 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $1,979 $1,772 Not Implemented
AS0513 # 06 Y:2022 06 2022 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,454 $122 Not Implemented
AS0513 # 05 Y:2022 05 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,700 $453 Not Implemented
AS0513 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $15,767 $43,000 Not Implemented
AS0513 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $44,875 $580,160 Not Implemented
AS0513 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,678 $302,167 Not Implemented
AS0513 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,618 $28,940 Not Implemented