IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
NAICS 334510 Electromedical and Electrotherapeutic Apparatus Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0290 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,248 $2,165 Implemented
MI0290 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $6,880 Not Implemented
MI0290 # 06 Y:2016 06 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,225 $15,465 Not Implemented
MI0290 # 05 Y:2016 05 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $5,243 $6,421 Not Implemented
MI0290 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,730 $16,200 Implemented
MI0290 # 03 Y:2016 03 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,761 $41,950 Not Implemented
MI0290 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,831 $40 Implemented
MI0290 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,253 $1,120 Implemented
MI0290 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $40 Implemented
SU0350 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $579 $340 Implemented
SU0350 # 06 Y:2013 06 2013 INSULATE FEEDWATER TANK $579 $190 Implemented
SU0350 # 05 Y:2013 05 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $191 Implemented
SU0350 # 04 Y:2013 04 2013 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $30,158 $131 Implemented
SU0350 # 03 Y:2013 03 2013 PAY BILLS ON TIME TO AVOID LATE FEES $1,239 $0 Implemented
SU0350 # 02 Y:2013 02 2013 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,049 $0 Implemented
SU0350 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,408 $0 Implemented
SU0350 # 11 Y:2013 11 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $221 $616 Implemented
SU0350 # 10 Y:2013 10 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $298 $705 Not Implemented
SU0350 # 12 Y:2013 12 2013 UPGRADE OBSOLETE EQUIPMENT $189 $852 Implemented
SU0350 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $771 Implemented
SU0350 # 08 Y:2013 08 2013 ELIMINATE/REDUCE AN OPERATION $18,624 $29,949 Not Implemented
SU0296 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $373 $732 Not Implemented
SU0296 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $5,928 Not Implemented
SU0296 # 10 Y:2010 10 2010 OPTIMIZE PLANT POWER FACTOR $1,823 $8,254 Not Implemented
SU0296 # 07 Y:2010 07 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $71,218 $132,133 Not Implemented