Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
118
matching recommendationsNAICS | 334511 | Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0558 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $259 | $154 | Not Implemented |
AS0558 # 10 Y:2023 | 10 | 2023 | MAINTAIN MACHINES TO REDUCE LEAKS | $94 | $181 | Implemented |
AS0558 # 08 Y:2023 | 08 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $317 | $1,148 | Not Implemented |
AS0558 # 06 Y:2023 | 06 | 2023 | ADJUST BURNERS FOR EFFICIENT OPERATION | $953 | $481 | Not Implemented |
AS0558 # 05 Y:2023 | 05 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $1,783 | $74 | Not Implemented |
AS0558 # 07 Y:2023 | 07 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $557 | $160 | Not Implemented |
AS0558 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $4,413 | $5,260 | Not Implemented |
AS0558 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $11,263 | $23,495 | Not Implemented |
AS0558 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,306 | $21,222 | Not Implemented |
AS0558 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,807 | $692,929 | Not Implemented |
MA0854 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $4,889 | $35,240 | Not Implemented |
MA0854 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,399 | $3,125 | Implemented |
MA0854 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,126 | $1,425 | Not Implemented |
MA0854 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $3,953 | $6,018 | Implemented |
MA0854 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,825 | $12,405 | Implemented |
MA0854 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,725 | $7,950 | Not Implemented |
UU0215 # 02 Y:2023 | 02 | 2023 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $4,878 | $48,510 | Implemented |
UU0215 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,368 | $27,177 | Implemented |
UU0215 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,775 | $52,882 | Implemented |
UU0215 # 07 Y:2023 | 07 | 2023 | REDESIGN PROCESS | $913 | $2,360 | Implemented |
UU0215 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,565 | $1,563 | Implemented |
UU0215 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,212 | $5,850 | Implemented |
UU0215 # 01 Y:2023 | 01 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,760 | $120,564 | Not Implemented |
UU0215 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $228 | $1,725 | Implemented |
UD1044 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,822 | $0 | Not Implemented |