IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0558 # 10 Y:2023 10 2023 MAINTAIN MACHINES TO REDUCE LEAKS $94 $181 Implemented
AS0558 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $154 Not Implemented
AS0558 # 08 Y:2023 08 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $317 $1,148 Not Implemented
AS0558 # 07 Y:2023 07 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $557 $160 Not Implemented
AS0558 # 06 Y:2023 06 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $953 $481 Not Implemented
AS0558 # 05 Y:2023 05 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,783 $74 Not Implemented
AS0558 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $4,413 $5,260 Not Implemented
AS0558 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,263 $23,495 Not Implemented
AS0558 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,306 $21,222 Not Implemented
AS0558 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $42,807 $692,929 Not Implemented
AS0513 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $15,767 $43,000 Not Implemented
AS0513 # 08 Y:2022 08 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,143 $411 Not Implemented
AS0513 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $1,979 $1,772 Not Implemented
AS0513 # 06 Y:2022 06 2022 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,454 $122 Not Implemented
AS0513 # 05 Y:2022 05 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,700 $453 Not Implemented
AS0513 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $44,875 $580,160 Not Implemented
AS0513 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,678 $302,167 Not Implemented
AS0513 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,618 $28,940 Not Implemented
AS0477 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,125 $1,213 Implemented
AS0477 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,264 $3,590 Implemented
AS0477 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,100 $7,907 Implemented
AS0477 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,747 $120,000 Implemented
AS0477 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $718,945 $688,982 Not Implemented
AS0405 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,884 $119,908 Not Implemented
AS0405 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $573 $612 Not Implemented