IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
NAICS 334513 Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0604 # 08 Y:2021 08 2021 UPGRADE CONTROLS ON COMPRESSORS $1,727 $6,630 Not Implemented
WV0604 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $1,749 $672 Implemented
WV0604 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $1,792 Implemented
WV0604 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,431 $403 Implemented
WV0604 # 04 Y:2021 04 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,330 $1,500 Implemented
WV0604 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $18,040 $7,122 Implemented
WV0604 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $20,602 $23,284 Implemented
WV0604 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,454 $75,747 Not Implemented
CO0739 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,090 $0 Implemented
CO0739 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $1,541 $3,605 Not Implemented
CO0739 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,067 $0 Implemented
CO0739 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $291 $185 Implemented
CO0739 # 02 Y:2020 02 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,357 $12,500 Not Implemented
CO0739 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $5,400 $11,069 Not Implemented
OK0868 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,347 $750 Implemented
OK0868 # 13 Y:2013 13 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $33,598 $0 Implemented
OK0868 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $19,626 $14,640 Not Implemented
OK0868 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,572 $7,700 Implemented
OK0868 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,792 $1,851 Implemented
OK0868 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,424 $2,973 Not Implemented
OK0868 # 06 Y:2013 06 2013 INSTALL SET-BACK TIMERS $3,871 $606 Implemented
OK0868 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $915 $4,669 Not Implemented
OK0868 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,328 $7,958 Not Implemented
OK0868 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $13,371 Implemented
OK0868 # 07 Y:2013 07 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $7,022 $1,140 Implemented