IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 334514 Totalizing Fluid Meter and Counting Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0246 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,692 $373 Not Implemented
UA0246 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,152 $150 Not Implemented
UA0246 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,600 $9,695 Implemented
UA0246 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $855 $1,067 Implemented
MZ0288 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $424 $430 Not Implemented
MZ0288 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,502 $3,320 Not Implemented
MZ0288 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,574 $1,660 Not Implemented
MZ0288 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,118 $3,400 Not Implemented
MZ0288 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,689 $41,089 Not Implemented
WV0591 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,574 $1,468 Implemented
WV0591 # 09 Y:2020 09 2020 DEVELOP A REPAIR/REPLACE POLICY $944 $338 Implemented
WV0591 # 10 Y:2020 10 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $507 $2,500 Not Implemented
WV0591 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,647 $958 Implemented
WV0591 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,927 $4,625 Implemented
WV0591 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $6,029 $6,375 Implemented
WV0591 # 01 Y:2020 01 2020 ADJUST BURNERS FOR EFFICIENT OPERATION $10,092 $27,700 Implemented
WV0591 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,896 $1,770 Not Implemented
WV0591 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $151 $373 Implemented
WV0591 # 07 Y:2020 07 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,752 $4,700 Implemented
WV0591 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $834 $50 Not Implemented
WV0591 # 12 Y:2020 12 2020 INSULATE BARE EQUIPMENT $98 $360 Not Implemented
WM0078 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,824 $1,300 Not Implemented
WM0078 # 06 Y:2015 06 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,749 $8,000 Not Implemented
WM0078 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $11,162 $18,000 Not Implemented
WM0078 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,459 $11,985 Not Implemented