IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
NAICS 334519 Other Measuring and Controlling Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0438 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,654 $53,450 Not Implemented
SD0438 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $12,712 $37,600 Implemented
SD0438 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $8,562 $25,530 Not Implemented
MA0667 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $45,912 $17,705 Not Implemented
MA0667 # 02 Y:2011 02 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $31,118 $100,000 Not Implemented
MA0667 # 03 Y:2011 03 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $11,694 $10,590 Implemented
MA0667 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $8,118 $0 Implemented
MA0667 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,023 $250 Implemented
MA0667 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,246 $3,000 Not Implemented
MA0667 # 07 Y:2011 07 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,047 $17,500 Not Implemented
MA0667 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,129 $6,340 Not Implemented
MA0667 # 09 Y:2011 09 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,515 $4,000 Not Implemented
MA0667 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $729 $180 Implemented
MA0667 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $525 $550 Not Implemented
MA0667 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $98 $201 Not Implemented
WI0503 # 01 Y:2005 01 2005 IMPROVE SPACE COMFORT CONDITIONING $47,772 $9,625 Not Implemented
WI0503 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,209 $21,960 Not Implemented
WI0503 # 03 Y:2005 03 2005 USE OPTIMUM THICKNESS INSULATION $8,005 $7,500 Not Implemented
WI0503 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,112 $1,000 Not Implemented
WI0503 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,506 $0 Not Implemented
WI0503 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,350 $640 Not Implemented
WI0503 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,742 $4,900 Not Implemented
MA0576 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $33,608 $2,000 Not Implemented
MA0576 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,240 $3,120 Implemented
MA0576 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,578 $7,342 Implemented