Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 334519 Other Measuring and Controlling Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0439 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $163,156 $302,600 Not Implemented
SD0439 # 05 Y:2011 05 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,990 $185,200 Not Implemented
SD0439 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,851 $8,326 Not Implemented
SD0439 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,510 $5,375 Not Implemented
SD0439 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,678 $700 Not Implemented
SD0439 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,054 $100 Not Implemented
SD0438 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,445 $1,530 Not Implemented
SD0438 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $8,562 $25,530 Not Implemented
SD0438 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $12,712 $37,600 Implemented
SD0438 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,654 $53,450 Not Implemented
SD0438 # 02 Y:2011 02 2011 COVER OPEN TANKS $36,210 $16,850 Not Implemented
SD0438 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $300 Implemented
SD0355 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,531 $1,040 Not Implemented
SD0355 # 07 Y:2005 07 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $1,560 $1,300 Not Implemented
SD0355 # 06 Y:2005 06 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,253 $18,500 Not Implemented
SD0355 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $897 $700 Implemented
SD0355 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $648 Not Implemented
SD0355 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Implemented
SD0355 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $7,397 $0 Implemented