IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,095

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0172 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,950 $4,508 Not Implemented
WI0457 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,805 $11,000 Not Implemented
WI0457 # 02 Y:2003 02 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,965 $800 Not Implemented
WI0457 # 03 Y:2003 03 2003 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $3,333 $8,000 Not Implemented
WI0457 # 04 Y:2003 04 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,413 $0 Not Implemented
WI0457 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $936 $200 Not Implemented
WI0457 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $740 Not Implemented
AM0446 # 01 Y:2003 01 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,000 $40,000 Implemented
AM0446 # 02 Y:2003 02 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,310 $0 Not Implemented
AM0446 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,850 $0 Implemented
AM0446 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,060 $0 Not Implemented
AM0446 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $500 Implemented
AM0446 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $650 Not Implemented
AM0446 # 07 Y:2003 07 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $730 $250 Implemented
AM0446 # 08 Y:2003 08 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $300 $0 Implemented
AM0446 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $140 $65 Not Implemented
UD0677 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $34,103 $28,000 Not Implemented
UD0677 # 02 Y:2003 02 2003 INSTALL TIMERS AND/OR THERMOSTATS $21,861 $489 Not Implemented
UD0677 # 03 Y:2003 03 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $18,425 $0 Implemented
UD0677 # 04 Y:2003 04 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,186 $72,000 Not Implemented
UD0677 # 05 Y:2003 05 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $17,000 $20,000 Implemented
UD0677 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,580 $53,130 Implemented
UD0677 # 07 Y:2003 07 2003 DISCONNECT BALLASTS $3,557 $297 Not Implemented
UD0677 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,700 $470 Implemented
UD0677 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,135 $400 Implemented