Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,189
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0154 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $692 | $133 | Implemented |
SU0154 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $0 | Not Implemented |
SU0154 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $601 | $264 | Not Implemented |
SU0154 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $134 | $120 | Implemented |
AS0343 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,371 | $20,633 | Implemented |
AS0343 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $228 | $30 | Not Implemented |
AS0343 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,795 | $30 | Implemented |
AS0343 # 04 Y:2003 | 04 | 2003 | RECOVER MECHANICAL ENERGY | $1,455 | $250 | Not Implemented |
AS0343 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $12,973 | $30,140 | Not Implemented |
AS0343 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,552 | $6,867 | Implemented |
AS0343 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $48 | $134 | Not Implemented |
AS0343 # 08 Y:2003 | 08 | 2003 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $6,600 | $60 | Implemented |
AS0343 # 09 Y:2003 | 09 | 2003 | MODIFY WORKLOAD | $41,600 | $250 | Implemented |
AS0343 # 10 Y:2003 | 10 | 2003 | AUTOMATE FINISHING PROCESS | $10,575 | $22,000 | Implemented |
AS0343 # 11 Y:2003 | 11 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $68,455 | $3,840 | Not Implemented |
AS0343 # 12 Y:2003 | 12 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $319,824 | $3,600 | Not Implemented |
BD0225 # 01 Y:2003 | 01 | 2003 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,792 | $10,000 | Not Implemented |
BD0225 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $1,196 | $2,100 | Not Implemented |
BD0225 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,618 | $5,072 | Not Implemented |
BD0225 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $724 | $3,630 | Not Implemented |
BD0225 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $873 | $300 | Not Implemented |
BD0225 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $439 | $2,280 | Not Implemented |
BD0225 # 07 Y:2003 | 07 | 2003 | DISCONNECT BALLASTS | $442 | $60 | Not Implemented |
BD0225 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $338 | $270 | Not Implemented |
BD0225 # 09 Y:2003 | 09 | 2003 | USE SYNTHETIC LUBRICANT | $240 | $350 | Not Implemented |