Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0575 # 07 Y:2022 | 07 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $200,000 | $0 | Implemented |
UF0575 # 04 Y:2022 | 04 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,193 | $12,000 | Not Implemented |
UF0575 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $320,724 | $1,068,750 | Implemented |
UF0575 # 02 Y:2022 | 02 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $175,432 | $0 | Not Implemented |
UF0575 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $59,112 | $64,054 | Implemented |
UF0575 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,831 | $290 | Implemented |
UF0575 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,361 | $0 | Implemented |
UF0536 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,130 | $557 | Not Implemented |
UF0536 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,433 | $2,264 | Not Implemented |
UF0536 # 04 Y:2019 | 04 | 2019 | CLEAN CONDENSER TUBES | $4,554 | $4,248 | Not Implemented |
UF0536 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,331 | $25,000 | Not Implemented |
UF0536 # 06 Y:2019 | 06 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,000 | $18,548 | Not Implemented |
UF0536 # 05 Y:2019 | 05 | 2019 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $25,860 | $33,265 | Not Implemented |
UF0536 # 07 Y:2019 | 07 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,297 | $3,028 | Not Implemented |
MI0357 # 08 Y:2019 | 08 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $996 | $2,040 | Implemented |
MI0357 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,575 | $160 | Implemented |
MI0357 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $18,306 | $3,600 | Implemented |
MI0357 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,689 | $1,980 | Implemented |
MI0357 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,870 | $8,000 | Implemented |
MI0357 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,177 | $2,193 | Not Implemented |
MI0357 # 07 Y:2019 | 07 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,267 | $1,195 | Implemented |
MI0357 # 02 Y:2019 | 02 | 2019 | USE SOLAR HEAT TO HEAT WATER | $11,005 | $67,338 | Not Implemented |
MI0357 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $558 | $1,773 | Not Implemented |
UF0517 # 06 Y:2018 | 06 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,963 | $0 | Implemented |
UF0517 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $131,032 | $232,640 | Implemented |