IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0551 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,783 $42,000 Not Implemented
NC0551 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $1,566 $4,256 Not Implemented
NC0551 # 06 Y:2015 06 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $509 $900 Not Implemented
NC0551 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,626 $2,505 Not Implemented
NC0551 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,392 $6,000 Not Implemented
NC0551 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,002 $100 Not Implemented
NC0551 # 02 Y:2015 02 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,494 $10,000 Not Implemented
NC0551 # 01 Y:2015 01 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $25,598 $8,900 Not Implemented
GT0887 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,870 $41,828 Not Implemented
GT0887 # 06 Y:2011 06 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,230 $0 Not Implemented
GT0887 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $15,716 $2,500 Implemented
GT0887 # 04 Y:2011 04 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,327 $0 Not Implemented
GT0887 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,160 $5,000 Not Implemented
GT0887 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $44,987 $50,000 Not Implemented
NC0435 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $661 $1,911 Implemented
NC0435 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $31 Not Implemented
NC0435 # 06 Y:2011 06 2011 INSTALL TIMERS AND/OR THERMOSTATS $295 $1,500 Implemented
NC0435 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $1,887 $7,760 Implemented
NC0435 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,479 $72,211 Implemented
NC0435 # 01 Y:2011 01 2011 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,638 $0 Not Implemented