Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0551 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,783 | $42,000 | Not Implemented |
NC0551 # 07 Y:2015 | 07 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,566 | $4,256 | Not Implemented |
NC0551 # 06 Y:2015 | 06 | 2015 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $509 | $900 | Not Implemented |
NC0551 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,626 | $2,505 | Not Implemented |
NC0551 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,392 | $6,000 | Not Implemented |
NC0551 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,002 | $100 | Not Implemented |
NC0551 # 02 Y:2015 | 02 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,494 | $10,000 | Not Implemented |
NC0551 # 01 Y:2015 | 01 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $25,598 | $8,900 | Not Implemented |
GT0887 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,870 | $41,828 | Not Implemented |
GT0887 # 06 Y:2011 | 06 | 2011 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,230 | $0 | Not Implemented |
GT0887 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,716 | $2,500 | Implemented |
GT0887 # 04 Y:2011 | 04 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,327 | $0 | Not Implemented |
GT0887 # 03 Y:2011 | 03 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,160 | $5,000 | Not Implemented |
GT0887 # 01 Y:2011 | 01 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $44,987 | $50,000 | Not Implemented |
NC0435 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $661 | $1,911 | Implemented |
NC0435 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $124 | $31 | Not Implemented |
NC0435 # 06 Y:2011 | 06 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $295 | $1,500 | Implemented |
NC0435 # 03 Y:2011 | 03 | 2011 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,887 | $7,760 | Implemented |
NC0435 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,479 | $72,211 | Implemented |
NC0435 # 01 Y:2011 | 01 | 2011 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $23,638 | $0 | Not Implemented |