Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
112
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0457 # 02 Y:2003 | 02 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,965 | $800 | Not Implemented |
WI0457 # 03 Y:2003 | 03 | 2003 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $3,333 | $8,000 | Not Implemented |
WI0457 # 04 Y:2003 | 04 | 2003 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,413 | $0 | Not Implemented |
WI0457 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $936 | $200 | Not Implemented |
WI0457 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $331 | $740 | Not Implemented |
WI0457 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,805 | $11,000 | Not Implemented |
AM0446 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $760 | $650 | Not Implemented |
AM0446 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,060 | $0 | Not Implemented |
AM0446 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,000 | $40,000 | Implemented |
AM0446 # 07 Y:2003 | 07 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $730 | $250 | Implemented |
AM0446 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,850 | $0 | Implemented |
AM0446 # 02 Y:2003 | 02 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,310 | $0 | Not Implemented |
AM0446 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,060 | $500 | Implemented |
AM0446 # 08 Y:2003 | 08 | 2003 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $300 | $0 | Implemented |
AM0446 # 09 Y:2003 | 09 | 2003 | USE PHOTOCELL CONTROLS | $140 | $65 | Not Implemented |
UD0677 # 09 Y:2003 | 09 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,135 | $400 | Implemented |
UD0677 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $1,019 | $252 | Not Implemented |
UD0677 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,700 | $470 | Implemented |
UD0677 # 12 Y:2003 | 12 | 2003 | ADD AREA LIGHTING SWITCHES | $344 | $820 | Not Implemented |
UD0677 # 13 Y:2003 | 13 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $143 | $400 | Not Implemented |
UD0677 # 07 Y:2003 | 07 | 2003 | DISCONNECT BALLASTS | $3,557 | $297 | Not Implemented |
UD0677 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,580 | $53,130 | Implemented |
UD0677 # 05 Y:2003 | 05 | 2003 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $17,000 | $20,000 | Implemented |
UD0677 # 03 Y:2003 | 03 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $18,425 | $0 | Implemented |
UD0677 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $21,861 | $489 | Not Implemented |