Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0457 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $936 | $200 | Not Implemented |
WI0457 # 03 Y:2003 | 03 | 2003 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $3,333 | $8,000 | Not Implemented |
WI0457 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $331 | $740 | Not Implemented |
WI0457 # 04 Y:2003 | 04 | 2003 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,413 | $0 | Not Implemented |
WI0457 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,805 | $11,000 | Not Implemented |
WI0457 # 02 Y:2003 | 02 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,965 | $800 | Not Implemented |
AM0446 # 02 Y:2003 | 02 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,310 | $0 | Not Implemented |
AM0446 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,000 | $40,000 | Implemented |
AM0446 # 09 Y:2003 | 09 | 2003 | USE PHOTOCELL CONTROLS | $140 | $65 | Not Implemented |
AM0446 # 08 Y:2003 | 08 | 2003 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $300 | $0 | Implemented |
AM0446 # 07 Y:2003 | 07 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $730 | $250 | Implemented |
AM0446 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $760 | $650 | Not Implemented |
AM0446 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,060 | $500 | Implemented |
AM0446 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,060 | $0 | Not Implemented |
AM0446 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,850 | $0 | Implemented |
UD0677 # 12 Y:2003 | 12 | 2003 | ADD AREA LIGHTING SWITCHES | $344 | $820 | Not Implemented |
UD0677 # 13 Y:2003 | 13 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $143 | $400 | Not Implemented |
UD0677 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $21,861 | $489 | Not Implemented |
UD0677 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,700 | $470 | Implemented |
UD0677 # 05 Y:2003 | 05 | 2003 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $17,000 | $20,000 | Implemented |
UD0677 # 01 Y:2003 | 01 | 2003 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $34,103 | $28,000 | Not Implemented |
UD0677 # 03 Y:2003 | 03 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $18,425 | $0 | Implemented |
UD0677 # 04 Y:2003 | 04 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,186 | $72,000 | Not Implemented |
UD0677 # 11 Y:2003 | 11 | 2003 | INSULATE BARE EQUIPMENT | $737 | $200 | Implemented |
UD0677 # 09 Y:2003 | 09 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,135 | $400 | Implemented |