Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0916 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $5,518 | $200 | Not Implemented |
GT0916 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM TEMPERATURE | $29,211 | $1,600 | Not Implemented |
GT0916 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $55,747 | $3,800 | Implemented |
GT0916 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $41,023 | $3,991 | Not Implemented |
GT0916 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $12,211 | $1,242 | Not Implemented |
GT0916 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,215 | $10,400 | Implemented |
GT0916 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,406 | $38,834 | Implemented |
GT0916 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,820 | $207,295 | Not Implemented |
GT0916 # 01 Y:2018 | 01 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,228 | $263 | Implemented |
SF0527 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $545 | $70 | Implemented |
SF0527 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,577 | $0 | Implemented |
SF0527 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,584 | $27,496 | Implemented |
SF0527 # 04 Y:2018 | 04 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $76,906 | $341,292 | Not Implemented |
UF0517 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $131,032 | $232,640 | Implemented |
UF0517 # 02 Y:2018 | 02 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,058 | $11,918 | Implemented |
UF0517 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,928 | $0 | Implemented |
UF0517 # 06 Y:2018 | 06 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,963 | $0 | Implemented |
UF0517 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,845 | $9,000 | Implemented |
UF0517 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,334 | $78,376 | Implemented |
TR0009 # 04 Y:2018 | 04 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,987 | $15,373 | Implemented |
TR0009 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $814 | $0 | Not Implemented |
TR0009 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $3,043 | $12,500 | Not Implemented |
TR0009 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,315 | $14,000 | Implemented |
TR0009 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $17,718 | $3,748 | Not Implemented |
TR0009 # 02 Y:2018 | 02 | 2018 | RECYCLE FLUORESCENT LAMPS | $6,608 | $13,260 | Implemented |