IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
NAICS 335122 Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0284 # 06 Y:2023 06 2023 PURCHASE EQUIPMENT INSTEAD OF LEASING $192,600 $121,203 n/a
IC0284 # 05 Y:2023 05 2023 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $152,337 $14,315 n/a
IC0284 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $556 $897 n/a
IC0284 # 03 Y:2023 03 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $445 $0 n/a
IC0284 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,864 $0 n/a
IC0284 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,480 $3,669 n/a
IC0284 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $190 $379 n/a
IC0284 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $415 $0 n/a
MZ0318 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,004 $200 Implemented
MZ0318 # 01 Y:2021 01 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $1,600 Implemented
MZ0318 # 06 Y:2021 06 2021 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,616 $0 Implemented
MZ0318 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $29,334 $6,436 Implemented
MZ0318 # 05 Y:2021 05 2021 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $168 $130 Implemented
MZ0318 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $248 $320 Implemented
AM0814 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,300 $7,400 Implemented
AM0814 # 08 Y:2020 08 2020 USE SYNTHETIC LUBRICANT $300 $200 Implemented
AM0814 # 07 Y:2020 07 2020 PAY UTILITY BILLS ON TIME $490 $0 Implemented
AM0814 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $500 $25 Implemented
AM0814 # 05 Y:2020 05 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,470 $4,340 Implemented
AM0814 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $1,000 Implemented
AM0814 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $6,460 $9,830 Not Implemented
AM0814 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $7,570 $2,000 Implemented
IP0136 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $921 $0 Implemented
IP0136 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,563 $32,451 Implemented
IP0136 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $672 $0 Implemented