IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
NAICS 335122 Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0749 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $24,207 $1,000 Implemented
MA0749 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,980 $3,330 Implemented
MA0749 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $10,366 $25,300 Not Implemented
MA0749 # 05 Y:2015 05 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,523 $1,000 Not Implemented
MA0749 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,856 $24,500 Implemented
MA0749 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,067 $3,000 Implemented
MA0749 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,495 $500 Not Implemented
MA0749 # 09 Y:2015 09 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $3,372 $1,000 Implemented
MA0749 # 10 Y:2015 10 2015 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,592 $500 Not Implemented
MA0749 # 11 Y:2015 11 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,227 $1,013 Not Implemented
MA0749 # 12 Y:2015 12 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,079 $100 Implemented
CO0700 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $1,270 Implemented
CO0700 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $4,710 $0 Not Implemented
CO0700 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,950 $82,280 Not Implemented
CO0700 # 04 Y:2015 04 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,840 $15,500 Not Implemented
CO0700 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $540 $1,820 Not Implemented
SD0489 # 01 Y:2014 01 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,747 $8,360 Implemented
SD0489 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $7,664 $12,000 Not Implemented
SD0489 # 03 Y:2014 03 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,939 $15,269 Not Implemented
SD0489 # 04 Y:2014 04 2014 USE PHOTOCELL CONTROLS $2,811 $8,510 Not Implemented
SD0489 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $434 $1,400 Implemented
SD0489 # 06 Y:2014 06 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $238 $200 Implemented
OR0601 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,114 $0 Implemented
OR0601 # 02 Y:2013 02 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,408 $3,874 Not Implemented
OR0601 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,167 $2,000 Not Implemented