Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsNAICS | 335210 | Small Electrical Appliance Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0034 # 07 Y:2009 | 07 | 2009 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,000 | $0 | Implemented |
TT0034 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,950 | $5,000 | Not Implemented |
TT0034 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,400 | $0 | Implemented |
TT0034 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,900 | $800 | Implemented |
TT0034 # 03 Y:2009 | 03 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,250 | $4,800 | Not Implemented |
TT0034 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,800 | $2,500 | Not Implemented |
TT0034 # 01 Y:2009 | 01 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,000 | $47,500 | Not Implemented |
GT0798 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,418 | $2,172 | Implemented |
GT0798 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,342 | $990 | Not Implemented |
GT0798 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $1,633 | $400 | Not Implemented |
GT0798 # 05 Y:2005 | 05 | 2005 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $14,902 | $2,757 | Not Implemented |
GT0798 # 06 Y:2005 | 06 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,855 | $0 | Not Implemented |
GT0798 # 07 Y:2005 | 07 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $6,739 | $0 | Implemented |
GT0798 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,607 | $4,928 | Implemented |
SD0335 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,899 | $8,001 | Not Implemented |
SD0335 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,194 | $80 | Not Implemented |
SD0335 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $857 | $0 | Implemented |
SD0335 # 04 Y:2004 | 04 | 2004 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $10,570 | $14,000 | Not Implemented |
SD0335 # 05 Y:2004 | 05 | 2004 | REDESIGN PROCESS | $12,125 | $8,000 | Implemented |