IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 33522 Major Appliance Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1026 # 02 Y:2021 02 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $174,302 $45,000 Implemented
UD1026 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,601 $0 Implemented
TT0233 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,084 $30,000 Implemented
TT0233 # 02 Y:2020 02 2020 METER WASTE WATER $52,049 $2,000 Implemented
TT0233 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $43,091 $147,540 Implemented
TT0233 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,859 $20 Implemented
TT0233 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,206 $22,392 Not Implemented
TT0233 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,658 $2,000 Implemented
TT0233 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $565 $1,450 Not Implemented
UD0712 # 11 Y:2005 11 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $259 $1,000 Implemented
UD0712 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,715 $60 Implemented
UD0712 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $8,635 $1,000 Implemented
UD0712 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,212 $22,500 Not Implemented
UD0712 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,955 $20,660 Not Implemented
UD0712 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,839 $839 Implemented
UD0712 # 06 Y:2005 06 2005 ELIMINATE SHIFT $2,256 $0 Not Implemented
UD0712 # 07 Y:2005 07 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,166 $525 Implemented
UD0712 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,616 $1,000 Not Implemented
UD0712 # 09 Y:2005 09 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,498 $0 Not Implemented
UD0712 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $953 $0 Not Implemented
UD0677 # 12 Y:2003 12 2003 ADD AREA LIGHTING SWITCHES $344 $820 Not Implemented
UD0677 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $737 $200 Implemented
UD0677 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,700 $470 Implemented
UD0677 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,580 $53,130 Implemented
UD0677 # 05 Y:2003 05 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $17,000 $20,000 Implemented