Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
773
matching recommendationsNAICS | 3353 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0645 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,027 | $20,044 | Not Implemented |
CC0020 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $4,526 | $0 | n/a |
CC0020 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $905 | $1,622 | n/a |
CC0020 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,402 | $3,033 | n/a |
CC0020 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31,379 | $0 | n/a |
CC0020 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $54,767 | $200,000 | n/a |
CC0020 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,812 | $19,750 | n/a |
CC0020 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,819 | $15,000 | n/a |
CC0020 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $17,389 | $200,000 | n/a |
CC0020 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,381 | $0 | n/a |
CC0020 # 10 Y:2023 | 10 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,194 | $0 | n/a |
CC0020 # 11 Y:2023 | 11 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $4,104 | $6,050 | n/a |
CC0020 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $418 | n/a |
WM0206 # 01 Y:2024 | 01 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,637 | $6,780 | Not Implemented |
WM0206 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,568 | $787 | Not Implemented |
WM0206 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $297 | $125 | Not Implemented |
WM0206 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $261 | $0 | Not Implemented |
TT0302 # 01 Y:2023 | 01 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $141,741 | $909,720 | Implemented |
TT0302 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,184 | $15,000 | Not Implemented |
TT0302 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,359 | $90,000 | Not Implemented |
TT0302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,127 | $1,500 | Implemented |
TT0302 # 05 Y:2023 | 05 | 2023 | METER WASTE WATER | $18,930 | $1,100 | Implemented |
TT0302 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,886 | $0 | Not Implemented |
TT0302 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,990 | $20,000 | Not Implemented |
TT0302 # 08 Y:2023 | 08 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,956 | $965 | Not Implemented |