Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
789
matching recommendationsNAICS | 3353 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0020 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31,379 | $0 | n/a |
CC0020 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,402 | $3,033 | n/a |
CC0020 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $905 | $1,622 | n/a |
CC0020 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $4,526 | $0 | n/a |
WM0206 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $261 | $0 | Not Implemented |
WM0206 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $297 | $125 | Not Implemented |
WM0206 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,568 | $787 | Not Implemented |
WM0206 # 01 Y:2024 | 01 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,637 | $6,780 | Not Implemented |
TT0302 # 08 Y:2023 | 08 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,956 | $965 | Not Implemented |
TT0302 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,990 | $20,000 | Not Implemented |
TT0302 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,886 | $0 | Not Implemented |
TT0302 # 05 Y:2023 | 05 | 2023 | METER WASTE WATER | $18,930 | $1,100 | Implemented |
TT0302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,127 | $1,500 | Implemented |
TT0302 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,359 | $90,000 | Not Implemented |
TT0302 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,184 | $15,000 | Not Implemented |
TT0302 # 01 Y:2023 | 01 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $141,741 | $909,720 | Implemented |
UC2306 # 12 Y:2023 | 12 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $20,361 | $73,450 | Not Implemented |
UC2306 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $429 | $1,916 | Not Implemented |
UC2306 # 10 Y:2023 | 10 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $207 | $733 | Not Implemented |
UC2306 # 09 Y:2023 | 09 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,865 | $22,297 | Not Implemented |
UC2306 # 08 Y:2023 | 08 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,986 | $3,066 | Not Implemented |
UC2306 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,153 | $34,274 | Implemented |
UC2306 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $70,539 | $385,242 | Not Implemented |
UC2306 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,621 | $1,600 | Not Implemented |
UC2306 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $795 | $600 | Not Implemented |