Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
736
matching recommendationsNAICS | 33531 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0574 # 02 Y:2005 | 02 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,700 | $2,350 | Not Implemented |
CO0574 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,160 | $210 | Implemented |
CO0574 # 04 Y:2005 | 04 | 2005 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $1,170 | $1,150 | Not Implemented |
CO0574 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $162 | $118 | Implemented |
CO0574 # 06 Y:2005 | 06 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $450 | $110 | Not Implemented |
CO0574 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,000 | $41,750 | Not Implemented |
CO0574 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,410 | $1,420 | Not Implemented |
CO0574 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,350 | $12,520 | Not Implemented |
CO0574 # 10 Y:2005 | 10 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,830 | $6,160 | Not Implemented |
CO0574 # 11 Y:2005 | 11 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $840 | $6,120 | Not Implemented |
GT0799 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,890 | $450 | Not Implemented |
GT0799 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,582 | $3,682 | Implemented |
GT0799 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,040 | $280,000 | Not Implemented |
GT0799 # 04 Y:2005 | 04 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,608 | $12,000 | Not Implemented |
GT0799 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,409 | $260,000 | Not Implemented |
GT0799 # 06 Y:2005 | 06 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,500 | $60,000 | Implemented |
BD0277 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,390 | $1,400 | Implemented |
BD0277 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,675 | $2,008 | Not Implemented |
BD0277 # 03 Y:2005 | 03 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $2,870 | $4,800 | Implemented |
BD0277 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,514 | $1,200 | Implemented |
BD0277 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,482 | $0 | Implemented |
BD0277 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,301 | $800 | Implemented |
BD0277 # 07 Y:2005 | 07 | 2005 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $736 | $0 | Implemented |
BD0277 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $426 | $297 | Implemented |
BD0277 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $395 | $525 | Implemented |