IAC logo
IAC Assessment: MZ0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2007
Principal Product Electric transformer core
NAICS 335311 - Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 25,000
Annual Production 60,000 Pieces
Production Hrs. Annual 4,680
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,087 484,898 kWh $0.09
Natural Gas $58,090 4,293 MMBtu $13.53
TOTAL ENERGY COSTS $100,177
RECOMMENDED SAVINGS* $48,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste
$ kWh $ kW-months/year $ lb
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$25,600
Cost:
-
$20,700 308,880 $4,900 790 - - $20,700
308,880
kWh
$4,900
790
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,872
Cost:
-
$10,438 153,504 $2,434 393 - - $10,438
153,504
kWh
$2,434
393
kW-months/year
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,576
Cost:
$2,450
$3,576 61,660 - - - - $3,576
61,660
kWh
-
-
kW-months/year
-
-
lb
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,001
Cost:
$2,500
- - $1,001 162 - - -
-
kWh
$1,001
162
kW-months/year
-
-
lb
05: 2.5194 REDESIGN PROCESS Savings:
$5,616
Cost:
-
- - - - $5,616 25,000 -
-
kWh
-
-
kW-months/year
$5,616
25,000
lb
TOTAL RECOMMENDED Savings:
$48,665
Cost:
$4,950
$34,714 524,044 $8,335 1,345 $5,616 25,000 $34,714
524,044
kWh
$8,335
1,345
kW-months/year
$5,616
25,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste