Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 33531 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0574 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,350 | $12,520 | Not Implemented |
CO0574 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,410 | $1,420 | Not Implemented |
CO0574 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,000 | $41,750 | Not Implemented |
CO0574 # 06 Y:2005 | 06 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $450 | $110 | Not Implemented |
CO0574 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $162 | $118 | Implemented |
CO0574 # 04 Y:2005 | 04 | 2005 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $1,170 | $1,150 | Not Implemented |
CO0574 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,160 | $210 | Implemented |
CO0574 # 02 Y:2005 | 02 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,700 | $2,350 | Not Implemented |
CO0574 # 01 Y:2005 | 01 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,120 | $6,000 | Not Implemented |
CO0574 # 10 Y:2005 | 10 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,830 | $6,160 | Not Implemented |
CO0574 # 11 Y:2005 | 11 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $840 | $6,120 | Not Implemented |
GT0799 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,582 | $3,682 | Implemented |
GT0799 # 06 Y:2005 | 06 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,500 | $60,000 | Implemented |
GT0799 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,409 | $260,000 | Not Implemented |
GT0799 # 04 Y:2005 | 04 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,608 | $12,000 | Not Implemented |
GT0799 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,040 | $280,000 | Not Implemented |
GT0799 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,890 | $450 | Not Implemented |
BD0277 # 07 Y:2005 | 07 | 2005 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $736 | $0 | Implemented |
BD0277 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $426 | $297 | Implemented |
BD0277 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $395 | $525 | Implemented |
BD0277 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,301 | $800 | Implemented |
BD0277 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,482 | $0 | Implemented |
BD0277 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,514 | $1,200 | Implemented |
BD0277 # 03 Y:2005 | 03 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $2,870 | $4,800 | Implemented |
BD0277 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,675 | $2,008 | Not Implemented |