Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsNAICS | 335312 | Motor and Generator Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0340 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,393 | $211,862 | n/a |
TT0340 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $76,635 | $17,000 | n/a |
TT0340 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $149,724 | $887,569 | n/a |
TT0340 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,176 | $200,000 | n/a |
TT0340 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,750 | $25,000 | n/a |
TT0340 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $194,175 | $1,500 | n/a |
TT0340 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,026 | $16,500 | n/a |
TT0340 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $833 | $700 | n/a |
TT0340 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $125,959 | $10,087 | n/a |
GT0987 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $827 | $1,740 | n/a |
GT0987 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,106 | $614,572 | n/a |
GT0987 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $339 | $875 | n/a |
GT0987 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,073 | $800 | n/a |
GT0987 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $369 | $90 | n/a |
GT0987 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,859 | $1,800 | n/a |
GT0987 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,518 | $100 | n/a |
GT0987 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,398 | $1,850 | n/a |
UL2414 # 06 Y:2024 | 06 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $71,333 | $21,308 | n/a |
UL2414 # 05 Y:2024 | 05 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,205 | $15,000 | n/a |
UL2414 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,855 | $3,045 | n/a |
UL2414 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,785 | $1,075,553 | n/a |
UL2414 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,526 | $1,500 | n/a |
UL2414 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $5,637 | $7,818 | n/a |
MS0414 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,129 | $37,628 | Not Implemented |
MS0414 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,747 | $144,100 | Not Implemented |