IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 335313 Switchgear and Switchboard Apparatus Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0337 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,895 $9,731 Implemented
MZ0337 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,106 $2,400 Implemented
MZ0337 # 03 Y:2023 03 2023 USE PHOTOCELL CONTROLS $314 $100 Implemented
MZ0337 # 06 Y:2023 06 2023 IMPROVE SPACE COMFORT CONDITIONING $150,000 $75,650 Implemented
MZ0337 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,882 $6,873 Implemented
OR0756 # 01 Y:2022 01 2022 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $73,790 $0 Implemented
OR0756 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,116 $120,000 Implemented
DL0207 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $557 $1,000 Implemented
DL0207 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,027 $0 Implemented
DL0207 # 13 Y:2022 13 2022 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $1,993 $2,500 Implemented
DL0207 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $6,208 Implemented
DL0207 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $801 $449 Implemented
DL0207 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $1,016 Implemented
WV0621 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,366 $465 Implemented
WV0621 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $98 Implemented
WV0621 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $12,269 $21,859 Implemented
WV0621 # 13 Y:2022 13 2022 DEVELOP A REPAIR/REPLACE POLICY $412 $1,761 Implemented
WV0621 # 09 Y:2022 09 2022 UPGRADE CONTROLS ON COMPRESSORS $1,010 $4,122 Implemented
WV0621 # 14 Y:2022 14 2022 INSULATE BARE EQUIPMENT $139 $325 Implemented
WV0621 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,302 $2,408 Implemented
WV0621 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $596 $2,747 Implemented
TR0009 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,987 $15,373 Implemented
TR0009 # 06 Y:2018 06 2018 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,315 $14,000 Implemented
TR0009 # 02 Y:2018 02 2018 RECYCLE FLUORESCENT LAMPS $6,608 $13,260 Implemented
MZ0213 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $1,940 $1,100 Implemented