Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
79
matching recommendationsNAICS | 3359 | Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0517 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,928 | $0 | Implemented |
UF0517 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,334 | $78,376 | Implemented |
UF0517 # 02 Y:2018 | 02 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,058 | $11,918 | Implemented |
UF0517 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $131,032 | $232,640 | Implemented |
MI0215 # 07 Y:2012 | 07 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $625 | $4,571 | Not Implemented |
MI0215 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,517 | $8,000 | Implemented |
MI0215 # 05 Y:2012 | 05 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,815 | $1,300 | Implemented |
MI0215 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,514 | $50 | Not Implemented |
MI0215 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,090 | $1,320 | Not Implemented |
MI0215 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,640 | $12,200 | Not Implemented |
MI0215 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,007 | $21,070 | Not Implemented |
MI0116 # 07 Y:2005 | 07 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,267 | $0 | Implemented |
MI0116 # 06 Y:2005 | 06 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,244 | $759 | Not Implemented |
MI0116 # 05 Y:2005 | 05 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,307 | $47 | Not Implemented |
MI0116 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,032 | $56 | Not Implemented |
MI0116 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,648 | $1,074 | Implemented |
MI0116 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $39,673 | $4,275 | Not Implemented |
MI0116 # 01 Y:2005 | 01 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,754 | $2,512 | Implemented |
MI0094 # 09 Y:2004 | 09 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $47,623 | $4,110 | Implemented |
MI0094 # 08 Y:2004 | 08 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $69,699 | $5,966 | Implemented |
MI0094 # 07 Y:2004 | 07 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $11,093 | $2,056 | Implemented |
MI0094 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,385 | $0 | Not Implemented |
MI0094 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,547 | $0 | Not Implemented |
MI0094 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $-177 | $590 | Implemented |
MI0094 # 02 Y:2004 | 02 | 2004 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $95,473 | $150 | Implemented |