Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,027
matching recommendationsNAICS | 3359 | Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0508 # 02 Y:2021 | 02 | 2021 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $775 | $81 | Not Implemented |
SU0508 # 03 Y:2021 | 03 | 2021 | REDUCE VENTILATION AIR | $2,405 | $499 | Not Implemented |
SU0508 # 04 Y:2021 | 04 | 2021 | INSTALL / REPAIR INSULATION ON STEAM LINES | $202 | $107 | Not Implemented |
SU0508 # 05 Y:2021 | 05 | 2021 | ELIMINATE/REDUCE AN OPERATION | $4,431 | $5,566 | Not Implemented |
SU0508 # 06 Y:2021 | 06 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,878 | $15,784 | Not Implemented |
SU0508 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $875 | $1,160 | Not Implemented |
SU0508 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $3,900 | $5,861 | Not Implemented |
SU0508 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,796 | $35,087 | Not Implemented |
SU0508 # 10 Y:2021 | 10 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $158 | $393 | Not Implemented |
SU0508 # 11 Y:2021 | 11 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $291 | $1,055 | Not Implemented |
NC0662 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,757 | $2,000 | n/a |
NC0662 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,792 | $5,472 | n/a |
NC0662 # 03 Y:2021 | 03 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,634 | $39,970 | n/a |
NC0662 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,566 | $3,150 | n/a |
NC0662 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $64 | $280 | n/a |
NC0662 # 06 Y:2021 | 06 | 2021 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $19,234 | $75,000 | n/a |
NC0662 # 07 Y:2021 | 07 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $78,648 | $250,000 | n/a |
LE0502 # 01 Y:2021 | 01 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,768 | $200 | Implemented |
LE0502 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $757 | $1,800 | Implemented |
LE0502 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,020 | $17,500 | Implemented |
LE0502 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,993 | $17,900 | Implemented |
MA0824 # 01 Y:2020 | 01 | 2020 | REPLACE BOILER | $15,999 | $29,000 | Not Implemented |
MA0824 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,379 | $54,695 | Not Implemented |
MA0824 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,177 | $29,750 | Implemented |
MA0824 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,118 | $7,710 | Implemented |