Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
379
matching recommendationsNAICS | 3359 | Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0328 # 02 Y:2025 | 02 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $184,128 | $600,000 | n/a |
TT0328 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,275 | $56,250 | n/a |
TT0328 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,117 | $1,990 | n/a |
TT0328 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,908 | $60,000 | n/a |
TT0328 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,292 | $50 | n/a |
TT0328 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,237 | $50 | n/a |
TT0328 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $81,754 | $144,000 | n/a |
TT0328 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,721 | $631,361 | n/a |
TT0328 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $92,553 | $200,000 | n/a |
TT0328 # 01 Y:2025 | 01 | 2025 | REDUCE OR ELIMINATE WASTE | $296,352 | $1,200,000 | n/a |
TT0328 # 11 Y:2025 | 11 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,157 | $299 | n/a |
TT0328 # 05 Y:2025 | 05 | 2025 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $52,760 | $41,250 | n/a |
TT0328 # 13 Y:2025 | 13 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $306 | $50 | n/a |
IP0206 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $719 | $419 | n/a |
IP0206 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,174 | $877 | n/a |
IP0206 # 06 Y:2024 | 06 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,970 | $4,748 | n/a |
IP0206 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,184 | $17,042 | n/a |
IP0206 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,948 | $83 | n/a |
IP0206 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,530 | $714 | n/a |
OK1134 # 04 Y:2025 | 04 | 2025 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $257,299 | $103,000 | n/a |
OK1134 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,152 | $858,000 | n/a |
OK1134 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $262 | $0 | n/a |
OK1134 # 03 Y:2025 | 03 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $11,172 | $0 | n/a |
OK1133 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $819 | $480 | n/a |
OK1133 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $878 | $1,370 | n/a |